Suntech has exhibited three core products that meet the mainstream needs of the Korean market: The high-efficiency poly half-cell module adopts mature MBB technology, which can reduce the horizontal propagation path of current by 50%, effectively reduce internal loss, increase module power and reduce the hot spot risk; As for mono half-cell double-glass module, the power output of this module can be increased by up to 25%, which provides customers with options of lower LCOE (Levelized Cost of Energy); the mono half-cell module adopts half-cell design, which can effectively prevent the shade losses. Moreover, due to the optimized circuit design, not only the highest power output is achieved, the reliability of the modules is also ensured, resulting in the improvement of long-term profitability.
With strong technical strength and brand influence, Suntech exhibits have attracted many inquiries from professionals such as developers, EPCs, investors and distributors.
Korean market is one of the GW-graded PV markets in the world. However, the barriers to enter the PV market in South Korea are high and the certification process for products takes very long time. Suntech did advanced planning and has been developing in Korean market for many years. Many Suntech products have obtained KS certification and enjoyed a good reputation in the market. Recent years, Suntech has developed a number of typical projects in South Korea, such as the Youngwol Photovoltaic Power Station (40MW), KAI Photovoltaic Rooftop Project for Industry and Commerce (3MW) and Gimcheon Photovoltaic Power Station (10MW), etc., which are all currently operating well.
Suntech has been focusing on module manufacturing for 20 years and is committed to providing customized products for global customers. In the future, Suntech will adhere to the strategy of “Global&Local” for market developing, and keep improving the pre-sale and after-sales service system in Korean market, and dedicate to providing PV products of high efficiency and reliability for Korean customers.
Previous: Suntech Expands Its High-efficiency Module Production Capacity by 1.5GW in Wuxi
Next: Suntech Announced Plan to Expand High-efficiency Module Production Capacity by 1.5GW and Signed Financial Credit Cooperation Agreement with Bank of Communications